Miss your VMware subscription anniversary and Broadcom adds 20% to the first-year renewal. This calculator shows, for your cluster, whether the move to Proxmox VE finishes before that date, and what the renewal costs if it does not.
| Physical cores in the cluster | - |
| Licensed cores (16-core minimum per CPU) | - |
| VMware subscription per year | - |
| Days the migration needs | - |
| Days short of the renewal date | - |
| Renewal you still owe if the migration overruns | - |
| 20% late surcharge if you let it lapse | - |
| VMs per week needed to finish in time | - |
Everything updates as you type. Nothing is uploaded. This runs in your browser.
· the .xlsx workbook with a Catch-up plan sheet, one-time payment, not a subscription. See your own answer above first.
16-core minimum per CPU. Broadcom bills the physical cores of every CPU, and never fewer than 16 per CPU (Broadcom KB 313548). Two 12-core CPUs are billed as 32 cores.
20% late-renewal surcharge. If the subscription is not renewed on its anniversary date, Broadcom adds 20% on top of the first year's renewal offer (Techzine, 28 March 2025).
No 72-core minimum. The 72-core order minimum announced for 10 April 2025 was withdrawn the same day; Broadcom kept the 16-core rule (iX / it-daily, 10 April 2025). Many calculators and chatbots still apply 72.
Why a free core calculator is not enough: it multiplies cores by a price, but it never compares your Proxmox VE migration pace with the renewal date. The example price of $135 per core per year is Redress Compliance's list estimate for vSphere Foundation; type the price from your own quote.